Retracted: Safety Risk Evaluation of Construction Site Based on Unascertained Measure and Analytic Hierarchy Process
Saved in:
Main Author: | Discrete Dynamics in Nature and Society |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2024-01-01
|
Series: | Discrete Dynamics in Nature and Society |
Online Access: | http://dx.doi.org/10.1155/2024/9806240 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Retracted: Sublinear Expectation Nonlinear Regression for the Financial Risk Measurement and Management
by: Discrete Dynamics in Nature and Society
Published: (2013-01-01) -
Retracted: Level and Drivers of China’s Construction Industry Energy Efficiency under Carbon Dioxide Emissions
by: Discrete Dynamics in Nature and Society
Published: (2024-01-01) -
Retracted: Construction and Research of Guqin Sound Synthesis and Plucking Big Data Simulation Model Based on Computer Synthesis Technology
by: Discrete Dynamics in Nature and Society
Published: (2024-01-01) -
Retracted: Risk Spillover: A New Perspective on the Study of Financing Difficulties for SMEs—Evidence from China
by: Discrete Dynamics in Nature and Society
Published: (2024-01-01) -
Retracted: Risk Evaluation Study of Urban Rail Transit Network Based on Entropy-TOPSIS-Coupling Coordination Model
by: Discrete Dynamics in Nature and Society
Published: (2024-01-01)