Development of a Semiautomatic Parametric Method for Creation of an I-BIM Model of a Tunnel for Use in FEM Software

This paper focuses on the design phase of I-BIM tunnelling projects using Sequential Excavation Method (SEM), in Europe, commonly referred to as the New Austrian Tunnelling Method (NATM), and addresses the problem of coupling geotechnical conditions and tunnelling Building Information Model (BIM) fo...

Full description

Saved in:
Bibliographic Details
Main Authors: Robert Klinc, Dani Gabršček, Jure Česnik, Marko Žibert, Martin Hostnik, Janko Logar
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Journal of Advanced Transportation
Online Access:http://dx.doi.org/10.1155/2021/8843277
Tags: Add Tag
No Tags, Be the first to tag this record!