A Method of LKJ Automatic Initial Positioning Based onLocomotive Shutting Protection System
At the departure station of CTCS-0 section, after a driver sets parameters through train operation monitoring device (referred to as “LKJ”), if initial positioning is operated ahead of time or behind time, it will lead to an error between LKJ displayed distance and actual distance. The train has the...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Control and Information Technology
2021-01-01
|
| Series: | Kongzhi Yu Xinxi Jishu |
| Subjects: | |
| Online Access: | http://ctet.csrzic.com/thesisDetails#10.13889/j.issn.2096-5427.2021.02.013 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|