COMPARATIVE STUDY OF B&B WITH HEURISTICS NEH AND CDS FOR BI STAGE FLOW SHOP SCHEDULING PROBLEM UNDER FUZZY ENVIRONMENT

A flow shop is a workspace where machines, which could be humans or machines perform a range of tasks. It involves figuring out how to arrange several jobs in the most effective way possible. In the manufacturing sector, production scheduling is essential for several reasons, including lower produc...

Full description

Saved in:
Bibliographic Details
Main Authors: Pooja Kaushik, Deepak Gupta, Sonia Goel
Format: Article
Language:English
Published: Institute of Mechanics of Continua and Mathematical Sciences 2025-02-01
Series:Journal of Mechanics of Continua and Mathematical Sciences
Subjects:
Online Access:https://jmcms.s3.amazonaws.com/wp-content/uploads/2025/02/14171822/jmcms-2503001-Comparative-study-of-BB-PK-DG.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!