Cutting-Caving Ratio Optimization of Fully Mechanized Caving Mining with Large Mining Height of Extremely Thick Coal Seam

Serious rib spalling and low recovery rate problems caused by the poor top-coal caving property (TCCP) were investigated in fully mechanized caving mining with large mining height (FMCMLMH) of extremely thick coal seam. For this aim, theoretical calculation, numerical simulation, and engineering app...

Full description

Saved in:
Bibliographic Details
Main Authors: Kai Wang, Tong Zhao, Kaan Yetilmezsoy, Xiaoqiang Zhang
Format: Article
Language:English
Published: Wiley 2019-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2019/7246841
Tags: Add Tag
No Tags, Be the first to tag this record!