Solution to Shorten Track Usable Length at City Railway Turnout Stations by Using Continuation Routes

[Objective]Compared to the CBTC (communication-based train control) system, CTCS2+ATO (Chinese train control system level 2 + automatic train operation) system requires longer usable track lengths due to its built-in protection zones, leading to increased construction investment for some underground...

Full description

Saved in:
Bibliographic Details
Main Author: SONG Rui
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2024-12-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.12.057.html
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850263322773946368
author SONG Rui
author_facet SONG Rui
author_sort SONG Rui
collection DOAJ
description [Objective]Compared to the CBTC (communication-based train control) system, CTCS2+ATO (Chinese train control system level 2 + automatic train operation) system requires longer usable track lengths due to its built-in protection zones, leading to increased construction investment for some underground turnout stations. Since city railways tend to have more underground stations, using the CTCS2+ATO system can significantly raise civil engineering costs. To improve the economic efficiency of such projects, it is necessary to study a solution is needed to reduce the track usable length requirements for city railway turnout stations using the CTCS2+ATO system. [Method]While maintaining the same safety protection distance, it is proposed to use virtual ground data to ensure accurate stopping positions and setting up continuation routes to shorten the effective track length at turnout stations. Key considerations for this solution, such as unlocking methods for continuation routes, signal placement, principles for configuring virtual data, safety guarantees during fault scenarios, and the setup of safety lines, are thoroughly analyzed. [Result & Conclusion]For unlocking continuation routes, a ′stop and unlock′ method is recommended. At turnout stations with side tracks, it is suggested to install safety lines in the track forward direction instead of the reverse direction to improve the operational efficiency. For city railway turnout stations, the proposed continuation route solution can reduce the distance between the platform end and the basic track joint in front of the turnout from 70 m to 25 m. This can significantly reduce the scale of underground stations, lower civil engineering costs, and improve the project overall economic efficiency.
format Article
id doaj-art-e8db2c6db1714ba48bd6b4393feb69e1
institution OA Journals
issn 1007-869X
language zho
publishDate 2024-12-01
publisher Urban Mass Transit Magazine Press
record_format Article
series Chengshi guidao jiaotong yanjiu
spelling doaj-art-e8db2c6db1714ba48bd6b4393feb69e12025-08-20T01:54:58ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2024-12-01271233734010.16037/j.1007-869x.2024.12.057Solution to Shorten Track Usable Length at City Railway Turnout Stations by Using Continuation RoutesSONG Rui0China Railway Fourth Survey and Design Institute Group Co, Ltd, 430063, Wuhan, China[Objective]Compared to the CBTC (communication-based train control) system, CTCS2+ATO (Chinese train control system level 2 + automatic train operation) system requires longer usable track lengths due to its built-in protection zones, leading to increased construction investment for some underground turnout stations. Since city railways tend to have more underground stations, using the CTCS2+ATO system can significantly raise civil engineering costs. To improve the economic efficiency of such projects, it is necessary to study a solution is needed to reduce the track usable length requirements for city railway turnout stations using the CTCS2+ATO system. [Method]While maintaining the same safety protection distance, it is proposed to use virtual ground data to ensure accurate stopping positions and setting up continuation routes to shorten the effective track length at turnout stations. Key considerations for this solution, such as unlocking methods for continuation routes, signal placement, principles for configuring virtual data, safety guarantees during fault scenarios, and the setup of safety lines, are thoroughly analyzed. [Result & Conclusion]For unlocking continuation routes, a ′stop and unlock′ method is recommended. At turnout stations with side tracks, it is suggested to install safety lines in the track forward direction instead of the reverse direction to improve the operational efficiency. For city railway turnout stations, the proposed continuation route solution can reduce the distance between the platform end and the basic track joint in front of the turnout from 70 m to 25 m. This can significantly reduce the scale of underground stations, lower civil engineering costs, and improve the project overall economic efficiency.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.12.057.htmlcity railwaysignaling systemcontinuation routeusable track length
spellingShingle SONG Rui
Solution to Shorten Track Usable Length at City Railway Turnout Stations by Using Continuation Routes
Chengshi guidao jiaotong yanjiu
city railway
signaling system
continuation route
usable track length
title Solution to Shorten Track Usable Length at City Railway Turnout Stations by Using Continuation Routes
title_full Solution to Shorten Track Usable Length at City Railway Turnout Stations by Using Continuation Routes
title_fullStr Solution to Shorten Track Usable Length at City Railway Turnout Stations by Using Continuation Routes
title_full_unstemmed Solution to Shorten Track Usable Length at City Railway Turnout Stations by Using Continuation Routes
title_short Solution to Shorten Track Usable Length at City Railway Turnout Stations by Using Continuation Routes
title_sort solution to shorten track usable length at city railway turnout stations by using continuation routes
topic city railway
signaling system
continuation route
usable track length
url https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.12.057.html
work_keys_str_mv AT songrui solutiontoshortentrackusablelengthatcityrailwayturnoutstationsbyusingcontinuationroutes