Modeling and Analysis of a Cutting Robot for the “Excavation–Backfill–Retention” Integrated Mining and Excavation Equipment
To meet the mining requirements of the ’excavation–backfill–retention’ tunneling method for inter-panel coal pillars, this paper proposes an integrated ‘excavation–backfill–retention’ equipment system centered on a cutting robot. An interactive design method was employed to analyze the interaction b...
Saved in:
| Main Authors: | Hongwei Ma, Wenda Cui, Chuanwei Wang, Xusheng Xue, Qinghua Mao, Haotian Wang, Limeng Xue, Hao Su, Zukun Yu, Jiashuai Cheng, Yifeng Guo, Kexiang Ma |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
MDPI AG
2025-04-01
|
| Series: | Actuators |
| Subjects: | |
| Online Access: | https://www.mdpi.com/2076-0825/14/4/175 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Wind temperature prediction model for ventilation cooling in excavation roadway containing cemented tailings backfill heat sources
by: Dingyi Wei, et al.
Published: (2024-12-01) -
Research on the Cutting Control Method of a Shield-Type Cutting Robot
by: Hongwei Ma, et al.
Published: (2024-12-01) -
Effect of Rubber Soil Backfill on Vibration Isolation of Open-cut Tunnels
by: YIN Donghao, et al.
Published: (2024-12-01) -
The Influence of Real-Time Feedback on Excavator Operator Actions in Footing Excavation: Machine Guidance and Conventional Methods
by: Hyunsik Kim, et al.
Published: (2025-03-01) -
Research on Temporary Support Robot for the Integrated Excavation and Mining System of Section Coal Pillar
by: Hongwei Ma, et al.
Published: (2025-04-01)