Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles
Aiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary, the pantograph and catenary parameters for 12...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Department of Electric Drive for Locomotives
2015-01-01
|
| Series: | 机车电传动 |
| Subjects: | |
| Online Access: | http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.021 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1850274437355536384 |
|---|---|
| author | ZHOU Dalin GAO Wei ZHENG Xuan |
| author_facet | ZHOU Dalin GAO Wei ZHENG Xuan |
| author_sort | ZHOU Dalin |
| collection | DOAJ |
| description | Aiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary, the pantograph and catenary parameters for 120 km/h vehicles operation were provided. The test validated the good effects. |
| format | Article |
| id | doaj-art-e53e69fe9c6644059139f009e8e0d4c5 |
| institution | OA Journals |
| issn | 1000-128X |
| language | zho |
| publishDate | 2015-01-01 |
| publisher | Editorial Department of Electric Drive for Locomotives |
| record_format | Article |
| series | 机车电传动 |
| spelling | doaj-art-e53e69fe9c6644059139f009e8e0d4c52025-08-20T01:51:09ZzhoEditorial Department of Electric Drive for Locomotives机车电传动1000-128X2015-01-01787920905633Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro VehiclesZHOU DalinGAO WeiZHENG XuanAiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary, the pantograph and catenary parameters for 120 km/h vehicles operation were provided. The test validated the good effects.http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.021120 km/h metro vehiclestiff contact wirepantograph and catenary arccatenary parametersimulationGuangzhou metroline 3 |
| spellingShingle | ZHOU Dalin GAO Wei ZHENG Xuan Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles 机车电传动 120 km/h metro vehicle stiff contact wire pantograph and catenary arc catenary parameter simulation Guangzhou metroline 3 |
| title | Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles |
| title_full | Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles |
| title_fullStr | Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles |
| title_full_unstemmed | Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles |
| title_short | Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles |
| title_sort | pantograph and catenary arc under stiff contact wires of 120 km h metro vehicles |
| topic | 120 km/h metro vehicle stiff contact wire pantograph and catenary arc catenary parameter simulation Guangzhou metroline 3 |
| url | http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.021 |
| work_keys_str_mv | AT zhoudalin pantographandcatenaryarcunderstiffcontactwiresof120kmhmetrovehicles AT gaowei pantographandcatenaryarcunderstiffcontactwiresof120kmhmetrovehicles AT zhengxuan pantographandcatenaryarcunderstiffcontactwiresof120kmhmetrovehicles |