Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles

Aiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary, the pantograph and catenary parameters for 12...

Full description

Saved in:
Bibliographic Details
Main Authors: ZHOU Dalin, GAO Wei, ZHENG Xuan
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2015-01-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.021
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1850274437355536384
author ZHOU Dalin
GAO Wei
ZHENG Xuan
author_facet ZHOU Dalin
GAO Wei
ZHENG Xuan
author_sort ZHOU Dalin
collection DOAJ
description Aiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary, the pantograph and catenary parameters for 120 km/h vehicles operation were provided. The test validated the good effects.
format Article
id doaj-art-e53e69fe9c6644059139f009e8e0d4c5
institution OA Journals
issn 1000-128X
language zho
publishDate 2015-01-01
publisher Editorial Department of Electric Drive for Locomotives
record_format Article
series 机车电传动
spelling doaj-art-e53e69fe9c6644059139f009e8e0d4c52025-08-20T01:51:09ZzhoEditorial Department of Electric Drive for Locomotives机车电传动1000-128X2015-01-01787920905633Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro VehiclesZHOU DalinGAO WeiZHENG XuanAiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary, the pantograph and catenary parameters for 120 km/h vehicles operation were provided. The test validated the good effects.http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.021120 km/h metro vehiclestiff contact wirepantograph and catenary arccatenary parametersimulationGuangzhou metroline 3
spellingShingle ZHOU Dalin
GAO Wei
ZHENG Xuan
Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles
机车电传动
120 km/h metro vehicle
stiff contact wire
pantograph and catenary arc
catenary parameter
simulation
Guangzhou metroline 3
title Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles
title_full Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles
title_fullStr Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles
title_full_unstemmed Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles
title_short Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles
title_sort pantograph and catenary arc under stiff contact wires of 120 km h metro vehicles
topic 120 km/h metro vehicle
stiff contact wire
pantograph and catenary arc
catenary parameter
simulation
Guangzhou metroline 3
url http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.021
work_keys_str_mv AT zhoudalin pantographandcatenaryarcunderstiffcontactwiresof120kmhmetrovehicles
AT gaowei pantographandcatenaryarcunderstiffcontactwiresof120kmhmetrovehicles
AT zhengxuan pantographandcatenaryarcunderstiffcontactwiresof120kmhmetrovehicles