Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles
Aiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary, the pantograph and catenary parameters for 12...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Department of Electric Drive for Locomotives
2015-01-01
|
| Series: | 机车电传动 |
| Subjects: | |
| Online Access: | http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.021 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|