Pantograph and Catenary Arc under Stiff Contact Wires of 120 km/h Metro Vehicles

Aiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary, the pantograph and catenary parameters for 12...

Full description

Saved in:
Bibliographic Details
Main Authors: ZHOU Dalin, GAO Wei, ZHENG Xuan
Format: Article
Language:zho
Published: Editorial Department of Electric Drive for Locomotives 2015-01-01
Series:机车电传动
Subjects:
Online Access:http://edl.csrzic.com/thesisDetails#10.13890/j.issn.1000-128x.2015.03.021
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Aiming at the 120 km/h vehicles pantograph and catenary arc of Guangzhou metro line 3 north-extension section, thearc generation cause was analyzed, and the pantograph and catenary model was built. With the simulation from the pantograph and thecatenary, the pantograph and catenary parameters for 120 km/h vehicles operation were provided. The test validated the good effects.
ISSN:1000-128X