Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization

In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Developm...

Full description

Saved in:
Bibliographic Details
Main Authors: Junjie Chen, Shurong Tong, Hongmei Xie, Yafei Nie, Jingwen Zhang
Format: Article
Language:English
Published: Wiley 2019-01-01
Series:Discrete Dynamics in Nature and Society
Online Access:http://dx.doi.org/10.1155/2019/2320632
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1832549338632421376
author Junjie Chen
Shurong Tong
Hongmei Xie
Yafei Nie
Jingwen Zhang
author_facet Junjie Chen
Shurong Tong
Hongmei Xie
Yafei Nie
Jingwen Zhang
author_sort Junjie Chen
collection DOAJ
description In resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Development (R&D) program management, from the traditional multimode resource-constrained project scheduling problem. A parameter and estimation formula to measure staff competency is presented, and a mixed-integer programming model is established for the problem. The single-objective optimization problems of optimal duration and optimal cost are solved sequentially according to the biobjective importance. To solve the model, according to the assumptions and constraints of the model, the initial network diagram of multiple projects is determined, the enumeration algorithm satisfying constraint conditions provides the feasible solution sets, and the algorithm based on dynamic programming is designed for phased optimization. Experimental results show that the proposed optimization model considering competence differences can solve the problem effectively.
format Article
id doaj-art-e00a701a69bf4155b5e3e224eedbf4a1
institution Kabale University
issn 1026-0226
1607-887X
language English
publishDate 2019-01-01
publisher Wiley
record_format Article
series Discrete Dynamics in Nature and Society
spelling doaj-art-e00a701a69bf4155b5e3e224eedbf4a12025-02-03T06:11:37ZengWileyDiscrete Dynamics in Nature and Society1026-02261607-887X2019-01-01201910.1155/2019/23206322320632Model and Algorithm for Human Resource-Constrained R&D Program Scheduling OptimizationJunjie Chen0Shurong Tong1Hongmei Xie2Yafei Nie3Jingwen Zhang4School of Management, Northwestern Polytechnical University, Xi’an 710072, ChinaSchool of Management, Northwestern Polytechnical University, Xi’an 710072, ChinaSchool of Electronics and Information, Northwestern Polytechnical University, Xi’an 710072, ChinaSchool of Management, Northwestern Polytechnical University, Xi’an 710072, ChinaSchool of Management, Northwestern Polytechnical University, Xi’an 710072, ChinaIn resource-constrained project scheduling problems, renewable resources can be expanded into human resources with competency differences. A flexible resource-constrained project scheduling problem with competency differences is proposed, which is a practical extension close to Research and Development (R&D) program management, from the traditional multimode resource-constrained project scheduling problem. A parameter and estimation formula to measure staff competency is presented, and a mixed-integer programming model is established for the problem. The single-objective optimization problems of optimal duration and optimal cost are solved sequentially according to the biobjective importance. To solve the model, according to the assumptions and constraints of the model, the initial network diagram of multiple projects is determined, the enumeration algorithm satisfying constraint conditions provides the feasible solution sets, and the algorithm based on dynamic programming is designed for phased optimization. Experimental results show that the proposed optimization model considering competence differences can solve the problem effectively.http://dx.doi.org/10.1155/2019/2320632
spellingShingle Junjie Chen
Shurong Tong
Hongmei Xie
Yafei Nie
Jingwen Zhang
Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
Discrete Dynamics in Nature and Society
title Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
title_full Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
title_fullStr Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
title_full_unstemmed Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
title_short Model and Algorithm for Human Resource-Constrained R&D Program Scheduling Optimization
title_sort model and algorithm for human resource constrained r d program scheduling optimization
url http://dx.doi.org/10.1155/2019/2320632
work_keys_str_mv AT junjiechen modelandalgorithmforhumanresourceconstrainedrdprogramschedulingoptimization
AT shurongtong modelandalgorithmforhumanresourceconstrainedrdprogramschedulingoptimization
AT hongmeixie modelandalgorithmforhumanresourceconstrainedrdprogramschedulingoptimization
AT yafeinie modelandalgorithmforhumanresourceconstrainedrdprogramschedulingoptimization
AT jingwenzhang modelandalgorithmforhumanresourceconstrainedrdprogramschedulingoptimization