Analysis of Wall Rock Stability in Tail Water Tunnel in Hydro-electric Station of Luji Plant
Saved in:
Main Authors: | FU Zhi-hao, HONG Wei-hui, HU Gang |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2012-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47657978&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of GPS to High-level Control Network in Hydropower Station of Luji Plant in Yunnan
by: ZHANG Yong, et al.
Published: (2008-01-01) -
Analysis of Geological Factors of Xikeng Tunnel Wall Rock Stability
by: HUANG Zhi-huai, et al.
Published: (2011-01-01) -
Implementation of LFP Batteries for Energy Storage at Small hydro power station
by: Huang Tianshuo
Published: (2025-01-01) -
Treatment of Vibration Problem in Hydro-generator Group in Xiangshui Hydropower Station
by: BI Ren-you, et al.
Published: (2009-01-01) -
Stress Analysis of Intake Tower s Foundation of Baise Hydro power Station
by: WU Sheng
Published: (2006-01-01)