Optimization of RoRo (Roll On-Roll Off) Ship Berthing Scheduling Using the Berth Allocation Problem (BAP) Model at Parit Rempak Port, Karimun Regency
Parit Rempak RORO Port is one of the sea transportation hubs that serves inter-regional connectivity in Karimun Regency. The limitations of the dock infrastructure, such as a length of 100 meters and a width of 11 meters, pose challenges in managing ship berthing schedules, especially RORO type ship...
Saved in:
| Main Authors: | , , , , , |
|---|---|
| Format: | Article |
| Language: | Indonesian |
| Published: |
Universitas Dian Nuswantoro
2025-08-01
|
| Series: | Techno.Com |
| Online Access: | https://publikasi.dinus.ac.id/index.php/technoc/article/view/13575 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|