Research on Slope Adjustment Design Method Ensuring Standard Geometric Shape and Position Construction of Circular Tunnel Drainage Ditches
[Objective] Prior to track laying in a circular subway tunnel, if the clearance under the tracks is insufficient, it will prevent drainage ditches from being constructed according to standard geometric shapes and positions. The smooth slope treatment in gentle interval slope section is prone to wate...