Determination of Industrial Enterprise Contract Demand Being Part of Maximum Power System Load
The paper considers a regime and economic essence of the problem pertaining to determination of the customer contract demand for industrial consumers of electric power with connected load of Sпp > 250 kV×A. A method for determination of the electric power customer half-hour maximum demand is...
Saved in:
| Main Authors: | , |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
Belarusian National Technical University
2011-02-01
|
| Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
| Online Access: | https://energy.bntu.by/jour/article/view/303 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Be the first to leave a comment!