Determination of Industrial Enterprise Contract Demand Being Part of Maximum Power System Load

The paper considers a regime and economic essence of the problem pertaining to determination of the customer contract demand for industrial consumers of electric power with connected load of Sпp > 250 kV×A. A method for determination of the electric power customer half-hour maximum demand is...

Full description

Saved in:
Bibliographic Details
Main Authors: V. N. Radkevich, О. А. Trifonova
Format: Article
Language:Russian
Published: Belarusian National Technical University 2011-02-01
Series:Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
Online Access:https://energy.bntu.by/jour/article/view/303
Tags: Add Tag
No Tags, Be the first to tag this record!