Determination of Industrial Enterprise Contract Demand Being Part of Maximum Power System Load
The paper considers a regime and economic essence of the problem pertaining to determination of the customer contract demand for industrial consumers of electric power with connected load of Sпp > 250 kV×A. A method for determination of the electric power customer half-hour maximum demand is...
Saved in:
| Main Authors: | V. N. Radkevich, О. А. Trifonova |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
Belarusian National Technical University
2011-02-01
|
| Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
| Online Access: | https://energy.bntu.by/jour/article/view/303 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Determination of Power Requirements for Industrial Enterprise Lighting
by: V. B. Kozlovskaya, et al.
Published: (2008-08-01) -
Optimization of Statistical Estimation of Half-Hour Load Maximum of Industrial Enterprise
by: V. A. Anischenko, et al.
Published: (2009-08-01) -
About Higher Efficiency Pertaining to Usage of Power Transformers at Industrial Enterprises
by: V. N. Radkevich, et al.
Published: (2008-02-01) -
Determination of Rational Load of Power Transformers under Conditions of Minimum Power Losses
by: V. N. Radkevich, et al.
Published: (2006-02-01) -
FORECASTING OF PRODUCTION OUTPUT FOR LIGHT INDUSTRY ENTERPRISES WITH PURPOSE TO DETERMINE THEIR POWER RESOURCES REQUIREMENTS. Part 1
by: V. N. Romaniuk, et al.
Published: (2015-08-01)