Analysis of Methods for Extending the Life Cycle of a TP-100A Boiler
Reconditioning of the TP-100А boiler can be implemented via a number of engineering solutions, including a complete replacement of the heating surface of the primary and secondary steam superheating circuits, boiler drum replacement, pulverized coal system closing, installation of gas-tight water wa...
Saved in:
| Main Authors: | Stepan Lys, Oksana Yurasova, Nadiya Lashkovska |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Lviv Polytechnic National University
2018-06-01
|
| Series: | Energy Engineering and Control Systems |
| Subjects: | |
| Online Access: | https://science.lpnu.ua/jeecs/all-volumes-and-issues/volume-4-number-1-2018/analysis-methods-extending-life-cycle-tp-100a |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Increasing the efficiency of the boiler house using screw expansion machines
by: R. R. Rotach, et al.
Published: (2022-06-01) -
Switching 300 MW Power-Generating Units with Gas-and-Oil-Fired Boilers to Increased Load Mode
by: Stepan Mysak, et al.
Published: (2021-07-01) -
Modification of the flow pattern in ducts outlet and economizer chamber for optimization of existing high pressure boilers to improve boiler performance
by: Abbas Behzadi, et al.
Published: (2025-07-01) -
Experimental Investigation of Two-Phase Closed Thermosyphons for Boiler Economizers
by: Epifanov A. A., et al.
Published: (2020-06-01) -
Analysis of the Energy and Emission Performance of an Automatic Biomass Boiler in the Context of Efficient Heat Management
by: Adam Nocoń, et al.
Published: (2024-11-01)