Analysis of Methods for Extending the Life Cycle of a TP-100A Boiler
Reconditioning of the TP-100А boiler can be implemented via a number of engineering solutions, including a complete replacement of the heating surface of the primary and secondary steam superheating circuits, boiler drum replacement, pulverized coal system closing, installation of gas-tight water wa...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Lviv Polytechnic National University
2018-06-01
|
| Series: | Energy Engineering and Control Systems |
| Subjects: | |
| Online Access: | https://science.lpnu.ua/jeecs/all-volumes-and-issues/volume-4-number-1-2018/analysis-methods-extending-life-cycle-tp-100a |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|