Optimizing the Long-Term Operating Plan of Railway Marshalling Station for Capacity Utilization Analysis
Not only is the operating plan the basis of organizing marshalling station’s operation, but it is also used to analyze in detail the capacity utilization of each facility in marshalling station. In this paper, a long-term operating plan is optimized mainly for capacity utilization analysis. Firstly,...
Saved in:
Main Authors: | Wenliang Zhou, Xia Yang, Jin Qin, Lianbo Deng |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2014-01-01
|
Series: | The Scientific World Journal |
Online Access: | http://dx.doi.org/10.1155/2014/251315 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Planning of Cascade Hydropower Stations with the Consideration of Long-Term Operations under Uncertainties
by: Changjun Wang, et al.
Published: (2019-01-01) -
Integrated Optimization of Service-Oriented Train Plan and Schedule on Intercity Rail Network with Varying Demand
by: Wenliang Zhou, et al.
Published: (2015-01-01) -
A Novel Space-Time-Speed Method for Increasing the Passing Capacity with Safety Guaranteed of Railway Station
by: Junfeng Wang, et al.
Published: (2017-01-01) -
The Marshall Plan and the European Integration: The Stance of Great Britain and France (1947–1948)
by: P. I. Falaleev
Published: (2020-11-01) -
Optimization Problem of Pricing and Seat Allocation Based on Bilevel Multifollower Programming in High-Speed Railway
by: Lianbo Deng, et al.
Published: (2021-01-01)