Multi-objective Optimization Model of Track Utilization for Depot-returning Urban Rail Transit Trains with Shunting Operation Constraints
[Objective] To improve the impact of shunting operations on the track utilization for the depot-returning urban rail transit trains and enhance the train maintenance efficiency, it is necessary to optimize the track utilization of the depot-returning train with shunting operation constraints. [Metho...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Urban Mass Transit Magazine Press
2025-01-01
|
Series: | Chengshi guidao jiaotong yanjiu |
Subjects: | |
Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.038.html |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841543716253204480 |
---|---|
author | ZHANG Zengchao XU Peng XIN Liping FAN Rui LI Chen WU Zelin |
author_facet | ZHANG Zengchao XU Peng XIN Liping FAN Rui LI Chen WU Zelin |
author_sort | ZHANG Zengchao |
collection | DOAJ |
description | [Objective] To improve the impact of shunting operations on the track utilization for the depot-returning urban rail transit trains and enhance the train maintenance efficiency, it is necessary to optimize the track utilization of the depot-returning train with shunting operation constraints. [Method] Regarded as a depot-returning train, the transition train is incorporated into the early and late depot-returning plans respectively according to the shunting time. With the minimum number of shunting operations and the shortest running distance for maintenance as the objective function, and taking the constraints of shunting operations into account, a multi-objective optimization model for train track utilization is developed based on an improved grey wolf algorithm, featuring first for individual independent depot-returning plan (early and late depot-returning) and then for all depot-returning plans as a whole. In a case study of the track utilization plan for the depot-returning train on a metro line in Tianjin, the effectiveness and feasibility of the established optimization model are verified. [Result & Conclusion] The train running distance of the track utilization plan obtained from the proposed model is reduced by 65.7% compared with the manual plan (with a 25% reduction in the early depot-returning stage and a 77.7% reduction in the late depot-returning stage), and the number of train shunting operations is zero. The model can achieve the optimal arrangement of track utilization for the depot-returning train on the basis of satisfying the constraints of shunting operations such as train washing, maintenance, and departure on the next day. |
format | Article |
id | doaj-art-afc20660073b4355be92957479a0921c |
institution | Kabale University |
issn | 1007-869X |
language | zho |
publishDate | 2025-01-01 |
publisher | Urban Mass Transit Magazine Press |
record_format | Article |
series | Chengshi guidao jiaotong yanjiu |
spelling | doaj-art-afc20660073b4355be92957479a0921c2025-01-13T08:04:42ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2025-01-0128121221610.16037/j.1007-869x.2025.01.038Multi-objective Optimization Model of Track Utilization for Depot-returning Urban Rail Transit Trains with Shunting Operation ConstraintsZHANG Zengchao0XU Peng1XIN Liping2FAN Rui3LI Chen4WU Zelin5Jinan CRRC Sri Intelligent Equipment Technology Co., Ltd., 250105, Jinan, ChinaSchool of Information and Control Engineering, Qingdao University of Technology, 266520, Qingdao, ChinaSchool of Information and Control Engineering, Qingdao University of Technology, 266520, Qingdao, ChinaSchool of Information and Control Engineering, Qingdao University of Technology, 266520, Qingdao, ChinaJinan CRRC Sri Intelligent Equipment Technology Co., Ltd., 250105, Jinan, ChinaJinan CRRC Sri Intelligent Equipment Technology Co., Ltd., 250105, Jinan, China[Objective] To improve the impact of shunting operations on the track utilization for the depot-returning urban rail transit trains and enhance the train maintenance efficiency, it is necessary to optimize the track utilization of the depot-returning train with shunting operation constraints. [Method] Regarded as a depot-returning train, the transition train is incorporated into the early and late depot-returning plans respectively according to the shunting time. With the minimum number of shunting operations and the shortest running distance for maintenance as the objective function, and taking the constraints of shunting operations into account, a multi-objective optimization model for train track utilization is developed based on an improved grey wolf algorithm, featuring first for individual independent depot-returning plan (early and late depot-returning) and then for all depot-returning plans as a whole. In a case study of the track utilization plan for the depot-returning train on a metro line in Tianjin, the effectiveness and feasibility of the established optimization model are verified. [Result & Conclusion] The train running distance of the track utilization plan obtained from the proposed model is reduced by 65.7% compared with the manual plan (with a 25% reduction in the early depot-returning stage and a 77.7% reduction in the late depot-returning stage), and the number of train shunting operations is zero. The model can achieve the optimal arrangement of track utilization for the depot-returning train on the basis of satisfying the constraints of shunting operations such as train washing, maintenance, and departure on the next day.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.038.htmlurban rail transitdepot-returning trainmulti-objective optimization model for train track utilizationshunting operation constraint |
spellingShingle | ZHANG Zengchao XU Peng XIN Liping FAN Rui LI Chen WU Zelin Multi-objective Optimization Model of Track Utilization for Depot-returning Urban Rail Transit Trains with Shunting Operation Constraints Chengshi guidao jiaotong yanjiu urban rail transit depot-returning train multi-objective optimization model for train track utilization shunting operation constraint |
title | Multi-objective Optimization Model of Track Utilization for Depot-returning Urban Rail Transit Trains with Shunting Operation Constraints |
title_full | Multi-objective Optimization Model of Track Utilization for Depot-returning Urban Rail Transit Trains with Shunting Operation Constraints |
title_fullStr | Multi-objective Optimization Model of Track Utilization for Depot-returning Urban Rail Transit Trains with Shunting Operation Constraints |
title_full_unstemmed | Multi-objective Optimization Model of Track Utilization for Depot-returning Urban Rail Transit Trains with Shunting Operation Constraints |
title_short | Multi-objective Optimization Model of Track Utilization for Depot-returning Urban Rail Transit Trains with Shunting Operation Constraints |
title_sort | multi objective optimization model of track utilization for depot returning urban rail transit trains with shunting operation constraints |
topic | urban rail transit depot-returning train multi-objective optimization model for train track utilization shunting operation constraint |
url | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.038.html |
work_keys_str_mv | AT zhangzengchao multiobjectiveoptimizationmodeloftrackutilizationfordepotreturningurbanrailtransittrainswithshuntingoperationconstraints AT xupeng multiobjectiveoptimizationmodeloftrackutilizationfordepotreturningurbanrailtransittrainswithshuntingoperationconstraints AT xinliping multiobjectiveoptimizationmodeloftrackutilizationfordepotreturningurbanrailtransittrainswithshuntingoperationconstraints AT fanrui multiobjectiveoptimizationmodeloftrackutilizationfordepotreturningurbanrailtransittrainswithshuntingoperationconstraints AT lichen multiobjectiveoptimizationmodeloftrackutilizationfordepotreturningurbanrailtransittrainswithshuntingoperationconstraints AT wuzelin multiobjectiveoptimizationmodeloftrackutilizationfordepotreturningurbanrailtransittrainswithshuntingoperationconstraints |