The Effort Of Performance Optimization With Basic Design Of Revitalization For Treatment Instalation Of Waste Water Cisirung, South Bandung

In relation to the efforts of restoration and water pollution control (PPA) into the upstream Citarum River, the revitalization of IPAL Cisirung is done to increase the capacity to optimize its performance. IPAL Cisirung is built with wastewater, chemical and biological waste treatment technology. T...

Full description

Saved in:
Bibliographic Details
Main Author: Ratna Adiana, Ratna Hidayat, Iskandar A Yusuf, Misbahudin Misbahudin, Ahmad Taufiq
Format: Article
Language:English
Published: Direktorat Bina Teknik Sumber Daya Air 2018-05-01
Series:Jurnal Sumber Daya Air
Subjects:
Online Access:https://jurnalsda.pusair-pu.go.id/index.php/JSDA/article/view/313/371
Tags: Add Tag
No Tags, Be the first to tag this record!