Study on the Floating of Large Diameter Underwater Shield Tunnel Caused by Synchronous Grouting
Synchronous grouting is the key factor causing segment floating during the construction of shield tunnel, especially the grout ratio and the control of the grouting pressure. In this paper, the ratio of grout material was optimized through multiple groups of physical and mechanical tests. The result...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2022-01-01
|
| Series: | Geofluids |
| Online Access: | http://dx.doi.org/10.1155/2022/2041924 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|