Study on the Floating of Large Diameter Underwater Shield Tunnel Caused by Synchronous Grouting

Synchronous grouting is the key factor causing segment floating during the construction of shield tunnel, especially the grout ratio and the control of the grouting pressure. In this paper, the ratio of grout material was optimized through multiple groups of physical and mechanical tests. The result...

Full description

Saved in:
Bibliographic Details
Main Authors: Yu Liang, Xumin Huang, Shijun Gao, Yihao Yin
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2022/2041924
Tags: Add Tag
No Tags, Be the first to tag this record!