Construction control of cable-stayed bridge top push method based on BIM technology
Abstract This research focuses on enhancing the precision and management of the top push method in cable-stayed bridge construction through the application of building information modeling (BIM) technology. By evaluating BIM standards, engineering decomposition standards, and modeling software, an a...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Springer
2025-04-01
|
| Series: | Discover Applied Sciences |
| Subjects: | |
| Online Access: | https://doi.org/10.1007/s42452-025-06764-1 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|