Parametric Optimization for Automatic Control System of 300 MW Power Units at a Constant Steam Pressure Upstream of the Turbine

The problem of parametric optimization of automatic control systems of power units (ACSPU) of 300 MW at the Lukoml’skaya GRES (Lukoml Condensing Power Plant) at a constant superheated steam pressure upstream of the turbine is under consideration. During 1974–1979, eight units of the Lukoml’skaya GRE...

Full description

Saved in:
Bibliographic Details
Main Authors: G. T. Kulakov, A. T. Kulakov, K. I. Artsiomenka
Format: Article
Language:Russian
Published: Belarusian National Technical University 2018-10-01
Series:Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика
Subjects:
Online Access:https://energy.bntu.by/jour/article/view/1400
Tags: Add Tag
No Tags, Be the first to tag this record!