The Mutriku Breakwater Wave Plant: Improvements and Their Influence on the Levelized Cost of Electricity (LCoE)

The Basque Energy Agency commissioned the Mutriku Wave Power Plant, using an Oscillating Water Column technology in 2011, and although the cumulative total power has been over 3 GW/h until 2023, the initial expectations of efficiency and LCoE have not been accomplished. This paper proposes a series...