TBM Net Advance Rate Prediction Model Based on Ridge Regression Analysis
[Objective] Accurate prediction of TBM (tunnel boring machine) net advance rate is of significant reference value for selecting urban tunneling methods, planning construction schedules, and controlling construction costs. [Method] Taking the dual-shield TBM construction of Qingdao Metro Line 1 as th...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2025-06-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.20230594.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|