The Deformation Analysis of a Deep Frame Top-Down Excavation in Downtown Shanghai Based on the 3D FEM

The deformation and environmental influence of the pit excavation in downtown is very important. A 3D FEM analysis is conducted to understand the deformation of a 13.9 to 15.2 m deep excavation with an in-plane dimension of about 189 m width and 251 m length constructed by the frame top-down method...

Full description

Saved in:
Bibliographic Details
Main Authors: Ting Bai, Dong Xie
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/2947544
Tags: Add Tag
No Tags, Be the first to tag this record!