Collaborative stress of concrete-filled steel tube tied-arch beam-column support based on the double-layer elastic foundation beam theory

The construction of concrete-filled steel tube tied-arch bridges typically employs the “beam first and arch later” methodology. In this approach, tie beams are initially constructed on temporary supports, followed by the erection of the arch ribs. When post-construction loads—such as those from arch...

Full description

Saved in:
Bibliographic Details
Main Authors: Jiazhu Tong, Hang Wang, Dalian Xu, Changjin Tian
Format: Article
Language:English
Published: Frontiers Media S.A. 2025-01-01
Series:Frontiers in Built Environment
Subjects:
Online Access:https://www.frontiersin.org/articles/10.3389/fbuil.2024.1517741/full
Tags: Add Tag
No Tags, Be the first to tag this record!