Evaluation of the Total Quality of Tunnel Contour Using Projection Pursuit Dynamic Cluster Method
Full understanding of the total quality of tunnel contour after smooth blasting is quite a valuable task for accurately assessing the cost and construction rate. The traditional evaluation of tunnel contour quality which is always based on a single index such as the over/underbreak might not be rati...
Saved in:
| Main Authors: | , , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2021/6660719 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|