Optimizing Construction Project Plan Management Using Parameter-Adaptive Improved Genetic Algorithm
This study proposes an optimization method for construction project plan management using a parameter-adaptive improved genetic algorithm (IGA) combined with differential evolution (DE). The method addresses the challenges of inflexibility, inefficient resource allocation, and unscientific schedulin...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Faculty of Mechanical Engineering in Slavonski Brod, Faculty of Electrical Engineering in Osijek, Faculty of Civil Engineering in Osijek
2025-01-01
|
Series: | Tehnički Vjesnik |
Subjects: | |
Online Access: | https://hrcak.srce.hr/file/471025 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|