Influence of Riverbed Pre-excavation on Local Scour of Pile Foundation Upstream of Cofferdam

The scour of pile foundation is closely related to the coupling action of water flow and sediment,and the local scour depth directly affects the safety and stability of the structure.Taking the deep-water foundation of a bridge as the research object,this paper constructs and verifies a three-dimens...

Full description

Saved in:
Bibliographic Details
Main Authors: LIU Congcong, LIN Hongxing, ZHAO Dongliang, CHAI Yuanfang
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2021-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.05.011
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841535707972108288
author LIU Congcong
LIN Hongxing
ZHAO Dongliang
CHAI Yuanfang
author_facet LIU Congcong
LIN Hongxing
ZHAO Dongliang
CHAI Yuanfang
author_sort LIU Congcong
collection DOAJ
description The scour of pile foundation is closely related to the coupling action of water flow and sediment,and the local scour depth directly affects the safety and stability of the structure.Taking the deep-water foundation of a bridge as the research object,this paper constructs and verifies a three-dimensional numerical sediment transport model to quantitatively analyze the flow and sediment movement rules of cofferdam and upstream pile foundation under the conditions of riverbed with and without pre-excavation.The results show that:the flow velocity at the upstream face of cofferdam is small,and that at the right angle of the cofferdam reaches the maximum.The back-row pile foundation is obviously affected by the wake of the front-row pile foundation and the reverse flow formed by the backwater of the downstream cofferdam.Under the condition of riverbed pre-excavation,the flow velocity around the cofferdam decreases,and the grooving is conducive to the backflow formation of the downward flow,and the weakening of sediment carrying capacity.Under the pre-excavation condition,the local flow velocity and scour depth of the upstream pile foundation decrease to different degrees,especially for the back-row pile foundation,with maximum local scour depth reduction of 82.86%~85.07%.
format Article
id doaj-art-8b1bf43d3f3e49efade472053d7b1a80
institution Kabale University
issn 1001-9235
language zho
publishDate 2021-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-8b1bf43d3f3e49efade472053d7b1a802025-01-15T02:28:58ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352021-01-014247647531Influence of Riverbed Pre-excavation on Local Scour of Pile Foundation Upstream of CofferdamLIU CongcongLIN HongxingZHAO DongliangCHAI YuanfangThe scour of pile foundation is closely related to the coupling action of water flow and sediment,and the local scour depth directly affects the safety and stability of the structure.Taking the deep-water foundation of a bridge as the research object,this paper constructs and verifies a three-dimensional numerical sediment transport model to quantitatively analyze the flow and sediment movement rules of cofferdam and upstream pile foundation under the conditions of riverbed with and without pre-excavation.The results show that:the flow velocity at the upstream face of cofferdam is small,and that at the right angle of the cofferdam reaches the maximum.The back-row pile foundation is obviously affected by the wake of the front-row pile foundation and the reverse flow formed by the backwater of the downstream cofferdam.Under the condition of riverbed pre-excavation,the flow velocity around the cofferdam decreases,and the grooving is conducive to the backflow formation of the downward flow,and the weakening of sediment carrying capacity.Under the pre-excavation condition,the local flow velocity and scour depth of the upstream pile foundation decrease to different degrees,especially for the back-row pile foundation,with maximum local scour depth reduction of 82.86%~85.07%.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.05.011local scournumerical modelriverbed pre-excavationcofferdampile foundation
spellingShingle LIU Congcong
LIN Hongxing
ZHAO Dongliang
CHAI Yuanfang
Influence of Riverbed Pre-excavation on Local Scour of Pile Foundation Upstream of Cofferdam
Renmin Zhujiang
local scour
numerical model
riverbed pre-excavation
cofferdam
pile foundation
title Influence of Riverbed Pre-excavation on Local Scour of Pile Foundation Upstream of Cofferdam
title_full Influence of Riverbed Pre-excavation on Local Scour of Pile Foundation Upstream of Cofferdam
title_fullStr Influence of Riverbed Pre-excavation on Local Scour of Pile Foundation Upstream of Cofferdam
title_full_unstemmed Influence of Riverbed Pre-excavation on Local Scour of Pile Foundation Upstream of Cofferdam
title_short Influence of Riverbed Pre-excavation on Local Scour of Pile Foundation Upstream of Cofferdam
title_sort influence of riverbed pre excavation on local scour of pile foundation upstream of cofferdam
topic local scour
numerical model
riverbed pre-excavation
cofferdam
pile foundation
url http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.05.011
work_keys_str_mv AT liucongcong influenceofriverbedpreexcavationonlocalscourofpilefoundationupstreamofcofferdam
AT linhongxing influenceofriverbedpreexcavationonlocalscourofpilefoundationupstreamofcofferdam
AT zhaodongliang influenceofriverbedpreexcavationonlocalscourofpilefoundationupstreamofcofferdam
AT chaiyuanfang influenceofriverbedpreexcavationonlocalscourofpilefoundationupstreamofcofferdam