Study on Reasonable Chain Pillar Size in a Thick Coal Seam

In order to solve the problem of low coal recovery rate caused by leaving large coal pillars in deep mines, the study determined the reasonable width of the section pillar, which based on the theory of coal pillar stress distribution, taking the 4102 headgate of Wenjiapo coal mine as the engineering...

Full description

Saved in:
Bibliographic Details
Main Authors: Kun Zhang, Fengfeng Wu, Xin Yue
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2022/7290894
Tags: Add Tag
No Tags, Be the first to tag this record!