Study on Reasonable Chain Pillar Size in a Thick Coal Seam
In order to solve the problem of low coal recovery rate caused by leaving large coal pillars in deep mines, the study determined the reasonable width of the section pillar, which based on the theory of coal pillar stress distribution, taking the 4102 headgate of Wenjiapo coal mine as the engineering...
Saved in:
| Main Authors: | , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2022-01-01
|
| Series: | Geofluids |
| Online Access: | http://dx.doi.org/10.1155/2022/7290894 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|