Track Alignment and Construction Method Comparison for Adding Stations to Long Metro Intervals in Loess Strata during Preliminary Design Stage
[Objective] To optimize the track-station alignment and construction methods for adding metro stations to long metro intervals in loess strata, a comparative study on economic efficiency and safety is required. [Method] An interval between Hangtiancheng Station and Dongchang’anjie Station on Xi’an M...
Saved in:
| Main Authors: | ZHOU Dingheng, ZHU Zhenlie, GAO Shengmiao, HOU Chunshan, LIU Jian, ZOU Yongxiang |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2025-06-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.20230575.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Deformation Law of Metro Station Underground Excavation by Arch Column Method in Upper-Soft and Lower-Hard Strata
by: WANG Xiang, et al.
Published: (2025-04-01) -
Prestress Loss Law of Anchor Cables and Deformation Control for Metro Station Deep Foundation Pit in Soil-rock Composite Strata
by: SUN Chao, et al.
Published: (2025-06-01) -
Structural Dynamics Response Characteristics of Metro Overlapping Stations under Train Loads in Complex Strata
by: CHEN Zhining, et al.
Published: (2025-07-01) -
Key Technologies for the Application of Prefabricated Interior Partition Walls in Metro Station Projects
by: LI Tao, et al.
Published: (2025-05-01) -
Technical and economic analysis of full and empty crossing methods in the sequence of station and tunnel construction in Tehran metro line seven
by: Seyed Amirhossein Ghoreishian, et al.
Published: (2020-11-01)