Track Alignment and Construction Method Comparison for Adding Stations to Long Metro Intervals in Loess Strata during Preliminary Design Stage
[Objective] To optimize the track-station alignment and construction methods for adding metro stations to long metro intervals in loess strata, a comparative study on economic efficiency and safety is required. [Method] An interval between Hangtiancheng Station and Dongchang’anjie Station on Xi’an M...
Saved in:
| Main Authors: | , , , , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2025-06-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.20230575.html |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|