Implementing Fuzzy TOPSIS on Project Risk Variable Ranking
Managing construction risks with a large number of risks with small impact can increase the additional effort and cost of inefficient construction. Therefore the variables need to be eliminated. The aim of this study is ranking the risk variable based on its frequency of occurrence by integrating ti...
Saved in:
Main Authors: | Saiful Husin, Fachrurrazi Fachrurrazi, Maimun Rizalihadi, Mubarak Mubarak |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/9283409 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Evaluating sustainable water management strategies using TOPSIS and fuzzy TOPSIS methods
by: Fang Han, et al.
Published: (2024-12-01) -
Bimbingan dan konseling di pesantren berlandaskan nilai religiusitas: kajian teori dan pola dasar
by: Muhammad Fachrurrazi, et al.
Published: (2023-08-01) -
Induced Interval-Valued Intuitionistic Fuzzy Hybrid Aggregation Operators with TOPSIS Order-Inducing Variables
by: Jun-Ling Zhang, et al.
Published: (2012-01-01) -
Extended TOPSIS Method for Supplier Selection under Picture Hesitant Fuzzy Environment Using Linguistic Variables
by: Rabia Ambrin, et al.
Published: (2021-01-01) -
Study and Analysis of Barriers for Implementation of Industry 4.0 Technologies Using Spherical Fuzzy TOPSIS Method
by: Akshay Kumar, et al.
Published: (2025-01-01)