Implementing Fuzzy TOPSIS on Project Risk Variable Ranking

Managing construction risks with a large number of risks with small impact can increase the additional effort and cost of inefficient construction. Therefore the variables need to be eliminated. The aim of this study is ranking the risk variable based on its frequency of occurrence by integrating ti...

Full description

Saved in:
Bibliographic Details
Main Authors: Saiful Husin, Fachrurrazi Fachrurrazi, Maimun Rizalihadi, Mubarak Mubarak
Format: Article
Language:English
Published: Wiley 2019-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2019/9283409
Tags: Add Tag
No Tags, Be the first to tag this record!