Study on Optimization of Delay Method of Wedge Cut Blasting in Tunnel
Relying on the entrance section of a high-speed railway tunnel blasting project, the fluid-solid coupling algorithm based on ANSYS/LS-DYNA was used to optimize the parameters of wedge cut blasting, and the vibration could be reduced on the basis of ensuring the blasting effect. Through the combinati...
Saved in:
Main Authors: | Wenle Gao, Zhicheng Liu, Yanping Wang, Zhenwei Yan, Zehua Zhang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Shock and Vibration |
Online Access: | http://dx.doi.org/10.1155/2021/1676269 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on the 2D Optimization Simulation of Complex Five-Hole Cutting Blasting under Different Lateral Pressure Coefficients
by: Jing Gao, et al.
Published: (2020-01-01) -
Study on Numerical Simulation of Geometric Elements of Blasting Funnel Based on PFC5.0
by: Wenle Gao, et al.
Published: (2021-01-01) -
Blasting Energy Analysis of the Different Cutting Methods
by: Ke Man, et al.
Published: (2018-01-01) -
Experimental study on pressure relief blasting in rock-blast tunnel
by: ZhenLin Chen, et al.
Published: (2025-01-01) -
Mechanism of Support Optimization and Confined Blasting of Thick and Hard Rock with a Wedge-Structure Immediate Roof: A Case Study
by: Tong Zhao, et al.
Published: (2021-01-01)