Study on Optimization of Delay Method of Wedge Cut Blasting in Tunnel
Relying on the entrance section of a high-speed railway tunnel blasting project, the fluid-solid coupling algorithm based on ANSYS/LS-DYNA was used to optimize the parameters of wedge cut blasting, and the vibration could be reduced on the basis of ensuring the blasting effect. Through the combinati...
Saved in:
Main Authors: | , , , , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Shock and Vibration |
Online Access: | http://dx.doi.org/10.1155/2021/1676269 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|