Study of Bridge Demolition DOT Survey and Available Standard Specifications
There are many damaged bridges in the United States which are either structurally deficient or functionally obsolete and require replacement or rehabilitation, many using accelerated bridge construction (ABC) techniques. Before a bridge is replaced or rehabilitated, the old structure or component ne...
Saved in:
Main Authors: | Nazanin Rezaei, David Garber |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2019-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2019/4896717 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Blast Demolition Study of Guyed Masts
by: Abinet K. Habtemariam, et al.
Published: (2018-01-01) -
Demolition Blues. Resistance Against Demolition Plans in a Danish Disadvantaged Affordable Housing Estate
by: Jonas Strandholdt Bach
Published: (2019-12-01) -
Geopolymer with brick and concrete demolition constructions waste
by: C. Parra, et al.
Published: (2024-12-01) -
Recycling Construction and Demolition Waste in the Sector of Construction
by: Yuvraj R. Patil, et al.
Published: (2024-01-01) -
Recycling of Brick and Road Demolition Waste in the Production of Concrete
by: Cherif Belebchouche, et al.
Published: (2024-09-01)