Grouting Treatment and Parameters Optimization in Watery Karst Areas of High Speed Railway Tunnel Based on Comprehensive Geological Forecast: A Case Study
Based on the failure of the initial grouting scheme in tunnel engineering, an integrated geological forecasting system incorporating an industrial endoscope was used to detect watery karst areas in this tunnel. Numerical simulations were used to analyze the change patterns of arch top settlement, ar...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2022-01-01
|
| Series: | Geofluids |
| Online Access: | http://dx.doi.org/10.1155/2022/7582916 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|