Grouting Treatment and Parameters Optimization in Watery Karst Areas of High Speed Railway Tunnel Based on Comprehensive Geological Forecast: A Case Study

Based on the failure of the initial grouting scheme in tunnel engineering, an integrated geological forecasting system incorporating an industrial endoscope was used to detect watery karst areas in this tunnel. Numerical simulations were used to analyze the change patterns of arch top settlement, ar...

Full description

Saved in:
Bibliographic Details
Main Authors: Shan Wu, Weichao Qiu, Dunwen Liu, Yu Tang
Format: Article
Language:English
Published: Wiley 2022-01-01
Series:Geofluids
Online Access:http://dx.doi.org/10.1155/2022/7582916
Tags: Add Tag
No Tags, Be the first to tag this record!