A Novel Time-Varying P-III Distribution Curve Fitting Model to Estimate Design Floods in Three Gorges Reservoir Operation Period

Design floods are traditionally estimated based on the at-site annual maximum flood series, including historical information of hydraulic structures. Nevertheless, the construction and operation of upstream reservoirs undermine the assumption of stationarity in the downstream flood data series. This...

Full description

Saved in:
Bibliographic Details
Main Authors: Yuzuo Xie, Shenglian Guo, Sirui Zhong, Xiaoya Wang, Jing Tian, Zhiming Liang
Format: Article
Language:English
Published: MDPI AG 2024-11-01
Series:Hydrology
Subjects:
Online Access:https://www.mdpi.com/2306-5338/11/12/203
Tags: Add Tag
No Tags, Be the first to tag this record!