Optimization Method for Solving the Reasonable Arch Axis of Long-Span CFST Arch Bridges
With the continuous construction of 500 m concrete-filled steel-tube (CFST) arch bridges such as the Bosideng Yangtze River Bridge and the Hejiang Changjiang Highway Bridge, the deviation between the dead pressure line and the arch axis produced by extant arch axis optimization methods increases. Th...
Saved in:
| Main Authors: | Xuesong Zhang, Ningyi Liang, Xiaohong Lu, Anbang Gu, Jidong Shan |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2019-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2019/7235656 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Seismic Response Analysis of Multidimensional and Multiangle Long-Span Top-Supported CFST Arch Bridge
by: Zite Li, et al.
Published: (2022-01-01) -
Seismic Damage Pattern Analysis of Long-Span CFST Arch Bridges Based on Damper Configuration Strategies
by: Bin Zhao, et al.
Published: (2025-08-01) -
Study on dynamic responses and impact factors of long span deck type CFST arch bridge under vehicle loads
by: Yong Zeng, et al.
Published: (2025-05-01) -
Non-uniform temperature fields and debonding of a long-span CFST arch bridge under coupled environmental actions
by: Qian Zhou, et al.
Published: (2025-12-01) -
Research on Hanger Force and Main Arch Stability of Long-Span Concrete-Filled Steel Tube Arch Bridge
by: Yanli Wu, et al.
Published: (2022-01-01)