Optimization Method for Solving the Reasonable Arch Axis of Long-Span CFST Arch Bridges

With the continuous construction of 500 m concrete-filled steel-tube (CFST) arch bridges such as the Bosideng Yangtze River Bridge and the Hejiang Changjiang Highway Bridge, the deviation between the dead pressure line and the arch axis produced by extant arch axis optimization methods increases. Th...

Full description

Saved in:
Bibliographic Details
Main Authors: Xuesong Zhang, Ningyi Liang, Xiaohong Lu, Anbang Gu, Jidong Shan
Format: Article
Language:English
Published: Wiley 2019-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2019/7235656
Tags: Add Tag
No Tags, Be the first to tag this record!