Resolving Pigging Stalls in Low-Pressure Offshore Gas Pipelines: A Case Study on Pressure Optimization at Offshore Southeast Sumatra, Indonesia

A pigging stall occurred in a 5.9 km, 16-inch offshore gas pipeline, connecting an offshore platform to a Floating Storage Offloading Unit (FSO), due to insufficient platform pressure (~60 psig). The stalled pigging operation halted production and created significant operational inefficiencies. The...

Full description

Saved in:
Bibliographic Details
Main Authors: Nauval Rizki Muhammad, Meidiya Putra Riko, Rasyid Ridho Muhammad, Chandra Kosasi Daviq, Fadly Enriko, Anang Safii Erik, Mujiburochman Muhamad
Format: Article
Language:English
Published: EDP Sciences 2025-01-01
Series:E3S Web of Conferences
Subjects:
Online Access:https://www.e3s-conferences.org/articles/e3sconf/pdf/2025/21/e3sconf_icgest2025_03009.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!