Evaluation of Energy Production and Energy Yield Assessment Based on Feasibility, Design, and Execution of 3 × 50 MW Grid-Connected Solar PV Pilot Project in Nooriabad

The installation of 3 × 50 MW (150 MW DC) large utility scale solar power plant is ground based using ventilated polycrystalline module technology with fixed tilt angle of 28° in a 750-acre land, and the site is located about 115 km northeast of Karachi, Pakistan, near the town of ThanoBula Khan, No...

Full description

Saved in:
Bibliographic Details
Main Authors: Irfan Jamil, Jinquan Zhao, Li Zhang, Rehan Jamil, Syed Furqan Rafique
Format: Article
Language:English
Published: Wiley 2017-01-01
Series:International Journal of Photoenergy
Online Access:http://dx.doi.org/10.1155/2017/6429581
Tags: Add Tag
No Tags, Be the first to tag this record!