Calculation Method of Downstream Water Level in Non-Spilling Periods of Hydropower Stations Based on Decision Tree Classification and Multiple Linear Regression
Accurate calculation of downstream water level during non-spilling periods is crucial for the safe operation of hydropower stations. Inaccurate water level calculations can lead to frequent modifications of power generation plans, seriously affecting the safe, stable, and efficient operation of hydr...
Saved in:
| Main Authors: | , , , , , , |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Editorial Office of Pearl River
2025-05-01
|
| Series: | Renmin Zhujiang |
| Subjects: | |
| Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2025.05.008 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|