Risk Analysis of Tunnel Construction Scheme Change based on Field Monitoring and Numerical Analysis
Because of the surrounding environment restriction, some sections of the Lanzhou Metro Line 2 were forced to change the original open excavation method to the concealed excavation method. Among them, the ingate is the transitional section connecting the shaft and the cross passage, which is accompan...