WWER-1000 accelerated unit unloading activation transient features
For WWER-1000 operation at power level more than 75 % of nominal one (Nnом) in case of failure of safety important equipment, the direct activation of accelerated unit unloading (AUU) signal is initiated. This causes the designated control rod regulating group to be dropped into the core to rapidly...
Saved in:
| Main Authors: | V. I. Borysenko, I. M. Kadenko, D. V. Samoilenko |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Institute for Nuclear Research, National Academy of Sciences of Ukraine
2009-06-01
|
| Series: | Ядерна фізика та енергетика |
| Subjects: | |
| Online Access: | http://jnpae.kinr.kiev.ua/10.2/Articles_PDF/jnpae-2009-10-0157-Borysenko.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of the influence of nuclear fuel burnup on the 16N formation rate in the primary coolant of the WWER-1000 reactor
by: Yu. Fylonych, et al.
Published: (2021-03-01) -
Comparison of Маster curve with normative method of estimating WWER-1000 reactor pressure vessel metal fracture toughness
by: V. M. Revka, et al.
Published: (2024-03-01) -
Fuel element cladding state change mathematical model for a WWER-1000 plant operated in the mode of varying loading
by: S. N. Pelykh
Published: (2010-09-01) -
NEUTRONIC ANALYSIS OF THE CANDIDATE MULTI-LAYER CLADDING MATERIALS WITH ENHANCED ACCIDENT TOLERANCE FOR WWER REACTORS
by: Ondřej Novák, et al.
Published: (2018-05-01) -
Uncertainty determination of fast neutron fluence onto the WWER pressure vessel metal surveillance specimens
by: О. M. Pugach, et al.
Published: (2021-03-01)