Research on Technology of Supporting in Super-Large Section Cut in Working Face with Large Mining Height
For the support problem of the super-large section cut in working face with large mining height, the 1105 cut pilot chamber of Zhaogu No. 2 Mine, the roof strata structure detection and the strata movement rule research were conducted. The results prove that concentrate fracture area, gradually spar...
Saved in:
Main Authors: | , |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/3304049 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|