Research on Technology of Supporting in Super-Large Section Cut in Working Face with Large Mining Height

For the support problem of the super-large section cut in working face with large mining height, the 1105 cut pilot chamber of Zhaogu No. 2 Mine, the roof strata structure detection and the strata movement rule research were conducted. The results prove that concentrate fracture area, gradually spar...

Full description

Saved in:
Bibliographic Details
Main Authors: Zhicheng Ren, Minghui Zuo
Format: Article
Language:English
Published: Wiley 2021-01-01
Series:Advances in Civil Engineering
Online Access:http://dx.doi.org/10.1155/2021/3304049
Tags: Add Tag
No Tags, Be the first to tag this record!